Detail operational parameters
As an MPD project progresses, detailed engineering is required to develop the specific MPD well plan.
Prior to starting MPD operations, certain parameters linked to specific procedures need to be determined using a dynamic hydraulic model.
If your control system does not allow for automated operations, one may wish to create flow-to-pressure tables for ECD compensation during connections, or displacement schedules for mud rollovers.
More advanced multi-fluid operations like managed pressure cementing (MPC) or spotting balanced mud pills can be planned and optimized.